Energy Management in Action: Energy Saving Case Studies

We are working hard on projects across Queen Mary’s UK campuses to increase energy efficiency through smart planning and cutting-edge technologies. Below are three case studies from recent projects implemented in some of our top energy-consuming buildings.

Joseph Priestly SRIFF Room

Stage of Works: Ongoing

Project details: In September 2024, we commissioned a heat recovery project that captures waste heat from a data centre and supplies it to our district heating network. Further details can be found on our News page. Man calibrates microscope settings on a computer

Total kWh saving expected: 3,400,000 kWh

Gas: 3,400,000 kWh

Electricity: N/A

Blizard & Abernethy Building Management System BMS IQ5 upgrades

Stage of Works: CompletedStudents standing outside the Blizard building

Project details: In April 2026 we completed the upgrade of the Building Management System (BMS) controls within the Blizard and Abernethy Buildings to Trend IQ5 controllers. The upgrade provides improved monitoring and control of building services, enabling better optimisation of plant operation, operating schedules and temperature control. These improvements help reduce unnecessary plant operation and associated electricity and gas consumption while supporting more efficient building performance.

Total kWh saving expected: 776,443 kWh

Electricity: 441,933 kWh

Gas: 334,510 kWh

Lecture Theatre Occupancy Control Installation

Stage of Works: In progress

Project details: We are installing occupancy-based controls across lecture theatres and teaching spaces in the following buildings:Graduate Centre lecture theatre full of students taking a class.

  • G.O. Jones
  • Graduate Centre
  • Blizard
  • Francis Bancroft
  • Arts Two
  • People’s Palace
  • Maths Building
  • Geography

The controls will enable building services to respond more closely to actual occupancy, reducing unnecessary operation of lighting and HVAC systems when spaces are unoccupied and improving overall energy efficiency.

Total kWh saving expected: 403,782 kWh

Electricity: 236,497 kWh

Gas: 167,285 kWh